According to Chung (1998) and Fortsch (2006), loading a mill less than 14% of its total volume will increase its specific power consumption as compared to when it is loaded greater than 25% of its ...
WhatsApp: +86 18203695377High temperature of the ball mill will affact the efficiency. 3 For every 1% increase in moisture, the output of the ball mill will be reduced by 8% 10%. 4 when the moisture is greater than 5%, the ball mill will be unable to perform the grinding operation. 5. The bearing of the ball mill is overheated and the motor is overloaded.
WhatsApp: +86 18203695377Ball Mill Crushing by tubemills were first introduced into the crushing departments of cyanide plants when it was found that for crushing finer than 30mesh other types of crushing machinery were not efficient. In order to crush with one pass, these mills were made 18 to 22 ft. ( to m.) in length. Pebbles were used as a grinding medium and the mills were lined with either silex blocks ...
WhatsApp: +86 18203695377WI= Work Index= specific energy per ton, kwh/metric ton (characterizes the ore) F80 = 80% passing size of the circuit feed, in microns. P80 = 80% passing size of the circuit product, in microns. Example. The dry feed of a ball mill circuit is 300 t/h. The power at the pinion of the ball mill is 1800 kW.
WhatsApp: +86 18203695377I'm interested to know when sizing a new ball mill, as to why recirculating load has no effect on the power calculation, although it will have effect on volumetric capacity naturally. For instance a mill of 300tph with a 300% recirculating load would have 1200 tph going through effectively, but if we reduce the recirculating load to 200% at ...
WhatsApp: +86 1820369537719. A certain crusher takes rock whose average particle diameter is m and crusher is to give a product whose average particle diameter is m at the rate of 20,000 kg/hr. At this rate, the mill takes 684 kgf m/sec of power and 35 kgfm/sec power is required to run it empty. (1) What would be the power consumption in terms of HP for same capacity if the average particle diameter in ...
WhatsApp: +86 18203695377power" required for size reduction. Actual powers can range from 2 to 20 times the calculated figures. Example In dry crushing of limestone, lumps of 50 mm size have their size reduced to 10 mm. Estimate the theoretical power required for a feed rate of 20 tph. Solution: According to Bond's law, the power is:) 1 1.(3600 36 ...
WhatsApp: +86 18203695377Chemical Engineering questions and answers. QUESTION FOUR (a) What is the power required to crush 100 tons/hr of limestone if 80% of the feed passes 2" screen and 80% of the product passes 1/8" screen? The work Index for limestone may be taken as kWh/short ton. 5 Points (b) If a ball mill requires 3 kWh per ton of feed to reduce a feed of ...
WhatsApp: +86 18203695377Abstract: In determining the proper mill size required to meet a targeted production rate, many factors are evaluated including: length to diameter (L/D) ratio, individual compartment lengths, rotational velocity, liner type, ball gradation and percent filling degree. This paper examines the effects of changing mill filling degree with respect to specific power consumption (kWh/ton) and ...
WhatsApp: +86 18203695377Ball Mill, Wet Ball Mill Lubrication system, Mill circuit tank with an agitator, Mill circuit Pump, Mill Hydro ... Design Capacity of mill TPH ... other components/ module shall be fully equipped to provide all signal requirements. All the 420 mA output signals from transmitters/other control system shall be able to drive minimum
WhatsApp: +86 18203695377Cytec Handbook. Why have a large circulation load:. If a product all finer than a certain critical size is required, the capacity of the ball mill is increased considerably by using it in closed circuit with a classifier and this increase is made still greater by increasing the circulating load in between the ball mill and the classifier (Fig. 70).
WhatsApp: +86 18203695377Rule 1: Always use a jaw crusher if you can due to lower costs. Rule 2: For low capacity applications, use jaw crusher and hydraulic hammer for oversize. Rule 3: For high capacities, use jaw crusher with big intake openings. Rule 4: For very high capacities, use gyratory crusher.
WhatsApp: +86 18203695377Mills of this kind reduce 1 or 2 ton/h to an average particle size of 1 to 20 µm, with an energy requirement of about 40 kWh/metric ton. Fluid energy mills: In such mills the particles are suspended in a highvelocity gas stream which flows in a circular or elliptical path. In some design there are jets that oppose one another or ...
WhatsApp: +86 18203695377What are the dimensions of the ball mill you are looking at? 40% ball charge is quite high (unless you are looking at a small mill). A difference (duty vs. maximum) of 5% to 10% is fairly typical and you would likely struggle to perceive an energy efficiency difference between the two operating points.
WhatsApp: +86 18203695377The operational controls are also reviewed for optimized mill operation. Every element of a closed circuit ball mill system is evaluated independently to assess its influence on the system. Figure 1 below is a typical example of inefficient grinding indicated by analysis of the longitudinal samples taken after a crash stop of the mill.
WhatsApp: +86 18203695377The mill used for this comparison is a diameter by meter long ball mill with a 5000 HP drive motor. It is designed for approximately 90 per hour. This type twocompartment mill is a state oftheart shell supported cement finish mill. The torque and time requirements of the mill with the ball
WhatsApp: +86 18203695377Jaw crushers, Ball mills, Fluid energy mills. Ball mills, Jaw crushers, Fluid energy mills ... The power required to crush 100 ton/hr of a material is kW, if 80% of the feed passes through a 51 mm screen and 80% of the product passes through a mm screen. ... GATECHmo2mark. mo. What is the critical rotational ...
WhatsApp: +86 18203695377At present, the average level of unit energy consumption of Cement Manufacturing Plants is at 33 kWh, in some Cement Manufacturing Plants, it could be 40 kWh higher than the average number. Through technology improvement, equipment update, and new type abrasion materials, the Cement Manufacturing Plant could reduce the unit energy consumption ...
WhatsApp: +86 18203695377Kick's law (1885) the energy required to reduce a material in size is directly proportional to the size reduction ratio dL/L, that is the ratio of the initial particle size to the finial particle size This implies that P equal to 1. If P = 1 then 2 1 ln L L CE putting C = KKfc gives: 2 1 ln L L fKE cK KK is not dimensionless.
WhatsApp: +86 18203695377In test 3, in which the grid was used to segregate the different sizes of balls, a further advantage of about 4 percent in efficiency is shown. The conical mill in test 4 increased the efficiency to 58 percent more than in test 1. The efficiency with the long (6foot) conical mill was about the same as with the short (3foot) one.
WhatsApp: +86 18203695377To reduce runofmine to mill feed requires reduction in a series of stages. The physical size and power requirements of a crusher capable of reducing hard rock vary depending on the application. Extended experience in most crushing plants show that a minus 19MM (¾") rod mill feed can be and is being produced in three stages of crushing.
WhatsApp: +86 18203695377A 20:1 reduction ratio of ore was desired. The mill was operated at 80% of the critical speed. ... Assuming a bed porosity of 40%, estimate the mill capacity in tonnes per year. A ball mill is to produce a grind of 34 μm (P 80) product from a feed size of 200 μm at a rate of t/h. ... power required at the mill shaft per tonne of ball, 2.
WhatsApp: +86 18203695377